New Construction Rates Fees are collected at the time of    issuance of the building permit


WATER CONNECTION PERMIT FEES:

Size of Water Servie Pipe                               2008 Rate
          Up to and Including 1"                         $1,670.00
                                           1-1 1/4"                $2,090.00
                                           1-1 1/2"                $2,510.00
                                           2"                         $3,340.00
                                           4"                         $6,690.00
                                           6"                         $10,030.00
                                           8"                         $13,370.00


SEWER CONNECTION PERMIT FEES:

Size of Sewer Service Pipe                              2008 Rate
                                           4"                         $1,670.00
                                           6"                         $2,510.00
                                           8"                         $3,340.00

TRUNK SEWER AND WATER FEES:

Land Use                            2008 Rate
Commercial                        $8,490.00 per adjusted gross acre*
Industrial                            $8,490.00 per adusted gross acre*
Residential:
       Single Family:              $1,270.00 per lot
       Twinhome/Duplex/
               Townhome           $950.00 per unit
        Multiple Family
               (Apartment)         $640.00 per unit

*Adjusted gross acre shall be interpreted as all property excluding only State Highway and County Road Right-of-way, wetland and steep slopes (greater than 35%)
Name:
Amber Kniefel
Email:
akniefel@qwestoffice.net
There is a one time water usage fee of $75.00 to cover the water used by contractor prior to the installation of the water meter.

Once the water meter is requested and left at the new construction site, the contractor/owner is required to pay the water and sewer bill.
EROSION CONTROL: $500 (Will be returned after inspection)