| New Construction Rates | Fees are collected at the time of issuance of the building permit WATER CONNECTION PERMIT FEES: Size of Water Servie Pipe 2008 Rate Up to and Including 1" $1,670.00 1-1 1/4" $2,090.00 1-1 1/2" $2,510.00 2" $3,340.00 4" $6,690.00 6" $10,030.00 8" $13,370.00 SEWER CONNECTION PERMIT FEES: Size of Sewer Service Pipe 2008 Rate 4" $1,670.00 6" $2,510.00 8" $3,340.00 TRUNK SEWER AND WATER FEES: Land Use 2008 Rate Commercial $8,490.00 per adjusted gross acre* Industrial $8,490.00 per adusted gross acre* Residential: Single Family: $1,270.00 per lot Twinhome/Duplex/ Townhome $950.00 per unit Multiple Family (Apartment) $640.00 per unit *Adjusted gross acre shall be interpreted as all property excluding only State Highway and County Road Right-of-way, wetland and steep slopes (greater than 35%) |
|||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||
| Name: | ||||||||||||||||||||||||||||||||||||||||
| Amber Kniefel | ||||||||||||||||||||||||||||||||||||||||
| Email: | ||||||||||||||||||||||||||||||||||||||||
| akniefel@qwestoffice.net | ||||||||||||||||||||||||||||||||||||||||
| There is a one time water usage fee of $75.00 to cover the water used by contractor prior to the installation of the water meter. Once the water meter is requested and left at the new construction site, the contractor/owner is required to pay the water and sewer bill. |
||||||||||||||||||||||||||||||||||||||||
| EROSION CONTROL: $500 (Will be returned after inspection) | ||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||